3 × 30 m
Reserve Bank of India
Three 30-metre exhaust stacks engineered and erected for the Bank’s six 1010 kVA sets across Belapur, Kharghar and Nagpur.
Cummins DG sets · Rental power · AMC · Pune, since 2011
DG sets on rent, 25–1250 kVA, across 20+ Indian cities — or yours to own: new Cummins gensets, 15–2750 kVA, supplied and commissioned as an Associate Dealer of Cummins Powerica.
Track record
Associate Dealer
Cummins Powerica
New Cummins DG sets 15–2750 kVA across Maharashtra, Goa, Karnataka, Kerala, Andhra Pradesh
Authorised Service Provider
Vertiv Energy India
Pan-India multi-brand DG service and AMC
Registered Service Provider
JLL India
AMC for JLL-managed facilities, Pan-India
Disclaimer Organisations shown are clients Power Solutions has supplied or serviced under purchase order. Logos are used for identification only; all trademarks and logos are the property of their respective owners.
Start here
What we do
New Cummins gensets, 15–2750 kVA, as an Associate Dealer of Cummins Powerica.
Short & long-term hire, 25–1250 kVA, delivered and commissioned across 20+ Indian cities.
Comprehensive and non-comprehensive multi-brand AMC with a 95% uptime guarantee.
D-check top overhauls, alternator overhauling and full stator rewinding up to 1250 kVA.
Supply, installation and integration of UPS systems and LT electrical panels with DG infrastructure.
Exhaust stacks to 30 m, synchronising panels, fuel systems, SITC and commissioning.
Compliance · 2026
New gensets must meet CPCB IV+ norms, and RECD retrofit enforcement on existing sets is active — driven by CAQM directions and state pollution-board mandates. We assess, retrofit and certify — before a notice arrives.
Proof, not promises
3 × 30 m
Three 30-metre exhaust stacks engineered and erected for the Bank’s six 1010 kVA sets across Belapur, Kharghar and Nagpur.
2 × 1500 kVA
Turnkey installations at Jabalpur and Bilaspur — synchronising panel at Jabalpur, 30 m exhaust structure at Bilaspur.
30 m
30-metre exhaust stack engineered and erected at Chakan for the plant’s own 2000 kVA set.
Industries
Why Power Solutions
Trust
15+ years of on-time delivery to India’s most demanding institutions — banks, bottlers, manufacturers.
Experience
OEM-level expertise across Cummins, Perkins, MTU and more, built on 27 years inside Cummins and Aggreko.
Commitment
Dedicated engineers keeping operations running 24×7, with a 4–6 hour breakdown response.
Deliver
From a single rental DG set to full turnkey installations with 30-metre exhaust stacks.
Our edge
Built in-house in 2026, DG Fleet Manager runs our entire operation — and your uptime benefits from it. No competitor manages a fleet this way.
Leadership
Founder Rajendra Patil spent 27 years at Cummins India and Aggreko before starting Power Solutions in 2011 to be the one-stop, multi-brand partner the market lacked. Today the company runs on a simple promise: every escalation path ends at a director, not a call centre.
Escalation, in writing
Questions, answered
Power Solutions rents DG sets on monthly billing. Long-term deployments typically run on 12-month terms with a lock-in and one month’s notice, while short-term hire for events, shutdowns or commissioning is available subject to fleet availability. A refundable security deposit of two months’ rent is standard.
Power Solutions is headquartered in Viman Nagar, Pune and operates a rental fleet deployed across 20+ Indian cities, including Ahmedabad, Bangalore, Bhiwandi, Hyderabad, Mumbai, Nagpur, Kolkata, Chennai, Coimbatore, Visakhapatnam, Aurangabad, Surat, Goa, Delhi-NCR and Jabalpur & Bilaspur. New Cummins DG set sales cover Maharashtra, Goa, Karnataka, Kerala and Andhra Pradesh under the Cummins Powerica associate dealership.
Yes. As an Associate Dealer of Cummins Powerica, Power Solutions supplies the Cummins range from 15 to 2750 kVA — CPCB IV+ certified up to 750 kVA, the standard for new diesel gensets in India since July 2023, with larger sets under the separate MoEFCC regime — and advises existing DG owners on RECD retrofit obligations.
Breakdown response on live rental and AMC contracts is typically 4–6 hours, backed by a zone-wise escalation matrix that ends at the director. On newer rental work orders, if downtime exceeds 24 hours Power Solutions places a standby DG set on site.
Both comprehensive and non-comprehensive annual maintenance contracts, on a multi-brand basis — Cummins, Kirloskar, Perkins, MTU and others. Contracts specify visit frequency, scheduled B-checks every 250–300 running hours, and a 95% uptime guarantee subject to load and power-factor conditions.
Power Solutions is an Associate Dealer of Cummins Powerica for new Cummins DG sets from 15 to 2750 kVA across Maharashtra, Goa, Karnataka, Kerala and Andhra Pradesh. It is also an Authorised Service Provider for Vertiv Energy India and a Registered Service Provider for JLL India.
Reply within 4 working hours. Engineered offer within 24 hours.
🔒 We don’t share your details with anyone. Replies come from a real engineer in Pune, not a call centre.