GSTIN 27ANQPP7409M1Z5 · Pan-India service · HQ Pune [email protected] ☎ +91 86054 45290

Industries · Pharma & Healthcare

Power where a dip is a batch loss

For a leading vaccine manufacturer we didn’t quote a genset — we wrote the analysis comparing their two ageing sets against one right-sized unit. That is how this sector deserves to be served.

Where it hurts

Validated environments

HVAC and cleanroom pressure cascades cannot ride through a changeover glitch. Power design is part of the validation envelope.

Batch-loss economics

A power event that costs a batch costs lakhs — the genset is insurance, and it must be sized and maintained like it.

Compliance stacking

CPCB IV+ on new sets, RECD circulars on old ones, noise norms, stack heights — pharma sites carry them all at once.

Typical configurations

Typical DG configurations — Pharma & Healthcare (indicative; sizing is always confirmed against the actual load list)
Facility typeTypical ratingNotes
Clinic / diagnostics25–82.5 kVALife-safety plus imaging equipment inrush
Hospital125–500 kVANo-break coordination with UPS, lifts, OT loads
Pharma plant400–1250 kVAProcess HVAC, consultative sizing, N+1

Served in this sector

Names, not adjectives.

  • Serum Institute of India — consultative generator replacement analysis
  • Johnson & Johnson site (via JLL) — RECD retrofit evaluation

Our consultative work in this sector includes a full replacement analysis for Serum Institute of India — maintenance cost and fuel-efficiency compared across options — and RECD retrofit evaluation with certified vendors for a J&J facility.

Pharma & Healthcare, answered

Frequently asked questions

Can you advise whether to replace or consolidate old DG sets?

Yes — that is exactly the analysis we prepared for Serum Institute of India: two ageing sets (250 and 62.5 kVA) compared against a single 400 kVA unit on maintenance cost and fuel efficiency, with a written recommendation. Engineering first, quotation second.

Do you handle emission compliance for pharma sites?

Yes — CPCB IV+ supply for new sets, and RECD retrofit evaluation for existing ones with CPCB-certified vendors, as done for a Johnson & Johnson facility. Maharashtra sites also fall under MPCB’s state RECD circular, which we assess site by site.

Can DG changeover work with a validated HVAC system?

It must — AMF timing, load-step sequencing and UPS bridging are engineered around the pressure cascade and equipment inrush, then proven in a witnessed load test before handover.

Reply within 4 working hours. Engineered offer within 24 hours.