Industries · Logistics & Warehousing
Power that keeps the dock moving
Our largest segment: rental DG sets deployed across logistics hubs in 15+ cities for a single network — with one contract, one SLA and one number to call.
Where it hurts
A dark dock is a missed cutoff
Sortation, dock levellers and scanners stop together. Every outage minute is a linehaul delay somewhere downstream.
Twenty hubs, twenty landlords
Every site has different power, space and compliance conditions — but your network needs one standard.
Night-shift breakdowns
Volume peaks at night. A vendor who answers at 2 AM is not optional.
Typical configurations
| Facility type | Typical rating | Notes |
|---|---|---|
| Last-mile / sortation hub | 62.5–125 kVA | Lighting, conveyors, scanners, office |
| Regional fulfilment centre | 125–250 kVA | Dock levellers, HVAC, racking-aisle lighting |
| Cold-chain / bonded warehouse | 250–500 kVA | Refrigeration load sized for starting current |
Served in this sector
Names, not adjectives.
- Busybees Logistics (Xpressbees) — hubs in 15+ cities
- Rivigo
- YCH Logistics India
- 20 Cube Logistics
- ProConnect Supply Chain Solutions
Multi-site work orders with per-hub schedules and consolidated billing are standard here — and the standby clause matters most in this sector: on newer work orders, if a rental is down beyond 24 hours, a standby set arrives at our cost.
Logistics & Warehousing, answered
Frequently asked questions
Can one rental contract cover hubs in multiple cities?
Yes — that is the normal structure for logistics networks we serve. One master agreement, per-hub work orders and schedules, consolidated billing, and the same 4–6 hour breakdown SLA at every site, from Bhiwandi to Guwahati.
How fast can you power a new hub going live?
In cities where the fleet is already deployed, typically 24–72 hours from work order to a commissioned set — which is why networks opening new dark stores and hubs keep us on call during rollout seasons.
What size DG set does a warehouse need?
Most sortation hubs run on 62.5–125 kVA; regional fulfilment centres 125–250 kVA; cold-chain sites more, because refrigeration compressors must be sized for starting current, not running load. We size it free against your equipment list.
Reply within 4 working hours. Engineered offer within 24 hours.