Tools that answer. Guides that don't waffle.

Built by the team that runs an eighty-plus-set fleet — every calculator shows its formula and its source, and every guide says the quiet parts about costs and compliance out loud.

Guides

Technical

Is your site actually ready for the DG set?

The site checklist before your genset arrives: clearances, ventilation, foundation, exhaust, day tank and earthing — from Cummins' installation bulletin.

Read the guide

Maintenance

Alternator stator rewinding: when to rewind, when to replace

When to rewind a failed alternator stator and when to replace it: meggering and PI evidence, execution risks, and a 1250 kVA rewind from the field.

Read the guide

Compliance

CPCB II vs CPCB IV+ vs RECD: which one applies to your generator?

CPCB II, CPCB IV+ and RECD are three separate regimes. One decision table shows which one binds your DG set — what you own, what you buy, where it runs.

Read the guide

Compliance

CPCB IV+ norms explained: what changed, who it binds, and what it costs

What CPCB IV+ means for diesel gensets: the gazette trail, what changed vs CPCB II, the 800 kW boundary, the supply window, and real cost impacts.

Read the guide

Technical

Cummins vs Kirloskar: an honest comparison from a dealer who services both

An Associate Dealer of Cummins Powerica that services Kirloskar under AMC compares both brands honestly: ranges, CPCB IV+, networks, and how to choose.

Read the guide

Technical

Data centre commissioning power: load bank testing and temporary supply

Why data centre builds run on rented generators before the permanent plant is live: L1–L5 commissioning, load bank testing, and synchronised DG banks.

Read the guide

Compliance

The 2026 DG owner's compliance calendar: every deadline in one place

Every DG set emission norms deadline in India as of 2026 — CPCB IV+, RECD, noise and stack dates in one calendar, plus GRAP rules and a quarterly checklist.

Read the guide

Costs

What's actually included in a DG rental contract — and who pays for diesel

Line by line through a DG rental work order: what the rent covers, who pays for diesel, deposit and GST mechanics, operators, and the breakdown SLA.

Read the guide

Maintenance

A, B, C and D checks explained: the complete DG maintenance ladder

What A, B, C and D checks on a DG set cover, what triggers each — running hours and calendar time — and how the check ladder maps to your AMC scope.

Read the guide

Compliance

DG set noise norms: 75 dB(A), acoustic enclosures, and how to actually pass

India's 75 dB(A) noise limit for DG sets: who it binds, type approval and CoP certification, 25 dB(A) acoustic enclosures, and zone-wise ambient limits.

Read the guide

Technical

DG synchronising panels and AMF: when you need them, and how SITC actually works

What an AMF panel does, when a DG installation needs a synchronising panel instead, and what SITC — supply, installation, testing, commissioning — covers.

Read the guide

Sizing

Powering a warehouse: the backup power guide for logistics operators

What a warehouse generator must power, why conveyor DOL starts set the kVA, siting and noise rules for warehouse parks, and when renting beats buying.

Read the guide

Technical

Prime vs standby vs continuous rating: why your 500 kVA isn't always 500 kVA

ESP, PRP, LTP and COP under ISO 8528-1 — hour caps, load factors and the 10% overload rule — and why a prime-rated 500 kVA isn't a standby 500.

Read the guide

Technical

DG AMC for bank branches: what RBI-grade standby power involves

Why bank standby power is different — security-controlled installs, statutory compliance, audit-grade records, and the DG AMC terms branch networks need.

Read the guide

Technical

DEF in CPCB IV+ gensets: the owner's guide nobody wrote

What DEF/AdBlue is, which CPCB IV+ DG sets actually need it, tank sizes per rating, and the mistakes that void warranties — from an 80-set fleet team.

Read the guide

Compliance

DG exhaust stack height: the CPCB formula, from the actual source

The CPCB stack-height formula H = h + 0.2√kVA explained with its actual source, worked examples, the separate >800 kW rule, and a 30 m RBI case study.

Read the guide

Sizing

What size generator do I need? The India kVA sizing guide

How to size a diesel generator in kVA: the 0.8 PF rule, motor starting current, headroom and wet stacking — worked examples plus a free calculator.

Read the guide