Service · Turnkey Projects
From bare site to running power
Supply, installation, testing, commissioning — plus the 30-metre stacks, synchronising panels and civil works that make it one contract instead of five.
Reserve Bank of India
Stacks at three sites for six 1010 kVA sets
Coca-Cola bottling plants
Turnkey + synchronising panel
Motherson
Stack for the plant’s own 2000 kVA set
Scope of work
BOQ-engineered like the tenders it grew up on — the RBI stack scope ran fabrication, erection, civil works and statutory fittings as one bill. That is the template every project gets.
- SITC — supply, installation, testing, commissioning
- Structural exhaust stacks to 30 m, with insulation & cladding
- Synchronising / PCC panels; multi-set and cross-brand sync
- Fuel systems — day tanks, bulk storage, piping
- Civil: foundations, grouting, waterproofing, tank shades
- AMF panels, changeovers, control wiring, load testing
The proof
Three 30-metre stacks for a central bank.
Belapur, Kharghar, Nagpur — six 1010 kVA sets and three 30-metre exhaust structures with aviation lamps and lightning arrestors, delivered inside RBI security and audit discipline. Institutions that cannot accept schedule risk hire the team that has already carried it.
Turnkey, answered
Frequently asked questions
What does turnkey mean in a DG installation?
One contract from bare site to running power: the genset, civil foundation, acoustic and exhaust structures, fuel systems, LT panels and cabling, statutory-compliant stack height, testing and commissioning — delivered by one accountable team instead of four subcontractors.
How tall can you build exhaust stacks?
Structural exhaust stacks to 30 metres are a proven scope — built three times over for the Reserve Bank of India at Belapur, Kharghar and Nagpur, and for Coca-Cola bottling and manufacturing plants, complete with support structures, guy systems, aviation lamps and lightning arrestors.
Can you synchronise new gensets with existing sets?
Yes — including across brands. A 1500 kVA set was synchronised with existing 1250 and 500 kVA units at a Coca-Cola bottling plant in Jabalpur, and a new 1010 kVA Cummins with existing CAT sets at Weikfield Foods, using synchronising/PCC panels with Woodward or equivalent controllers.
What is included in the exhaust scope?
MS B-class piping, rock-wool insulation with aluminium cladding, residential-grade silencers, steel bellows, hanger and support structures, painting and fuel piping — priced per metre and per set in the BOQ, the same structure used on RBI and bottling-plant jobs. On V-engine sets from about 1000 kVA, the scope covers both banks: two runs, two silencers, and the fabricated Y-joint into a common pipe sized to the rating — 14 inch at 1000 kVA up to 18 inch at 2000 kVA.
Do you handle the civil and fabrication work too?
Yes — foundations and grouting, canopy waterproofing, fuel tank shades, pipe laying and fabrication, panel shifting. Power Solutions self-performs or directly manages this scope, so the schedule has one owner.
Who handles statutory compliance for the installation?
The installation is engineered to the applicable CPCB/MoEF norms — stack height for the rating, acoustic treatment to 75 dBA, CPCB-compliant silencers — with the documentation handed over statutory-ready. Consent-to-operate filings remain the occupier’s, with our paperwork behind them.