Projects

Proof at national scale

Six case studies from fifteen years — central banks, bottling plants, IT campuses and factories. Every number below is real, and every client can be called.

Installation work

Not every job is a 30-metre stack. DG platforms and plinths, exhaust runs taken above building height, day tanks and diesel lines, bore earthing, canopy rebuilds, AMF and synchronising panels — unretouched photographs from our own site records.

Crane placing a 400 kVA silent DG set onto its concrete plinth at night
Serum Institute of India · Pune Crane placement of the 400 kVA Cummins set onto its cast plinth.
A 400 kVA silent DG set installed under a custom steel weather canopy
Serum Institute of India · Pune The 400 kVA set finished under a custom weather-protection canopy, exhaust run complete.
A 200 kVA Cummins DG set installed in a basement genset room
Tanishq · Laxmi Road, Pune The replacement 200 kVA set was too tall to move into the basement in one piece — so it was stripped of canopy and exhaust silencer, shifted into position, and reassembled in place.
Twin insulated exhaust stacks rising through galvanised support steel
Finolex Industries · Urse Twin insulated exhaust stacks through support steel.
A silent DG set on a dockside powering refit work at the base of a jack-up rig
Global Offshore · dry dock A 320 kVA, 60 Hz set powering a jack-up rig refit — frequency matched to the vessel, not the grid.
An installed 320 kVA Cummins silent DG set with residential silencer
Accurate Gauging 320 kVA CPCB-II Cummins set, supplied, automated and commissioned.
A DG exhaust line routed up a building facade above roof height
Ruby Hall Clinic · Shirur Exhaust run taken above building height.
A fuel day tank with diesel line piping serving a DG set
Motherson group unit · Chakan Day tank and diesel line serving a 250 kVA set — earthing and stack under the same order.
A bore earthing pit under construction at a DG installation
Bore earthing going in — the part of an installation nobody photographs, except us.
Rockwool acoustic insulation fitted into new DG canopy panels
Vertiv Energy Acoustic rockwool going into replacement canopy panels for a 500 kVA set.