Project · F&B / Bottling
Two 1500 kVA turnkey installations at Coca-Cola bottling plants
ClientCoca-Cola bottling plants (Udaipur Beverages & Narmada Drinks)
LocationJabalpur, MP · Bilaspur, CG
Capacity2 × 1500 kVA
ScopeTurnkey installation with synchronising panel and 30 m stack
The brief
Two bottling plants, two 1500 kVA installations. At Jabalpur, the new set had to synchronise with the plant’s existing 1250 and 500 kVA units — three generators of different vintages sharing one bus. At Bilaspur, full turnkey scope including a 30-metre exhaust structure.
What made it hard
- Cross-vintage synchronisation: a new 1500 kVA set paralleled with existing 1250 and 500 kVA units at Jabalpur
- Production-line economics — installation sequenced around a running bottling operation
- 30-metre exhaust structure at Bilaspur, statutory height for the rating
What we did
- 11 × 1500 kVA set at Jabalpur with synchronising panel, paralleled to existing sets
- 21 × 1500 kVA turnkey installation at Bilaspur with 30 m exhaust structure
- 3Commissioning and load testing on both sites
From the site
Unretouched photographs from our own site record of this job.
2 × 1500 kVA turnkey sets
3-set synchronised bus at Jabalpur
30 m exhaust structure at Bilaspur