GSTIN 27ANQPP7409M1Z5 · Pan-India service · HQ Pune [email protected] ☎ +91 86054 45290

Industries · Manufacturing

Sized for the starting current, not the nameplate

Manufacturing loads lie: a 30 HP motor draws six times its nameplate at direct-on-line start. Sets sized here are sized for that truth — up to the 30 m stack we engineered for Motherson’s 2000 kVA set.

Where it hurts

Motor inrush trips undersized sets

DOL starting draws 6–7× full-load current. A set sized on running load stalls on the first compressor.

Shutdown windows are short

Annual maintenance shutdowns need temporary power on a schedule that slips for no one.

Exhaust and noise compliance

MIDC neighbours and pollution-board consent conditions make stacks and enclosures part of the machine.

Typical configurations

Typical DG configurations — Manufacturing (indicative; sizing is always confirmed against the actual load list)
Facility typeTypical ratingNotes
Machine shop / MSME unit62.5–160 kVAMotor mix with DOL starting margins
Mid-size plant250–750 kVAStandby or prime, rental during shutdowns
Large plant1010–2000+ kVATurnkey SITC with exhaust and electrical infra

Served in this sector

Names, not adjectives.

  • Motherson — 30 m exhaust stack (2000 kVA set)
  • SEDEMAC Mechatronics — 750 kVA rental, 24/7 dual-DG scope
  • Siemens — works at Goa and Kalwa
  • Supreme Industries — 30 m exhaust stack, Jalgaon

The rental fleet doubles as shutdown insurance for this sector — 750 kVA-class sets deployed for round-the-clock coverage during plant works, as done for SEDEMAC, with the standby clause in writing.

Manufacturing, answered

Frequently asked questions

How do you size a genset for motor-heavy loads?

Against starting current, not running load: direct-on-line motors draw six to seven times nameplate at start, so the set (and its alternator) is chosen for the worst starting step with the rest of the plant online. Star-delta and VFD starts change the arithmetic — send the equipment list and we compute it.

Can you provide temporary power for a plant shutdown?

Yes — rental sets up to 1250 kVA with delivery, commissioning, and B-checks included, scheduled to your shutdown window, including 24/7 dual-set coverage of the kind SEDEMAC Mechatronics runs.

Do you build the exhaust and electrical infrastructure too?

Yes — turnkey SITC including stacks to 30 metres (built for Supreme Industries at Jalgaon among others), fuel systems, panels and commissioning, under one contract.

Reply within 4 working hours. Engineered offer within 24 hours.