GSTIN 27ANQPP7409M1Z5 · Pan-India service · HQ Pune [email protected] ☎ +91 86054 45290

Industries · IT, QSR & Managed Facilities

The vendor your facility manager stops worrying about

D-check overhauls on four 1010 kVA sets at IBM Bangalore. AMCs across JLL-managed portfolios. If you carry someone else’s SLA, we are built to sit underneath it.

Where it hurts

You own an SLA you don’t control

FM contracts promise uptime on equipment someone else maintains. The DG vendor is the difference between promise and breach.

Portfolios, not sites

Twenty sites, five brands of genset, one quarterly review. Reporting has to roll up cleanly.

Campus power at scale

IT campuses run multi-megawatt DG farms where overhauls must happen without ever exposing the load.

Typical configurations

Typical DG configurations — IT / QSR / Facilities (indicative; sizing is always confirmed against the actual load list)
Facility typeTypical ratingNotes
QSR / retail outlet25–62.5 kVAChain-wide AMC, per-outlet schedules
Office / branch portfolio62.5–250 kVAMulti-brand PPM under one contract
IT campus4 × 1010 kVA and upStaged overhauls, load never exposed

Served in this sector

Names, not adjectives.

  • IBM Bangalore — D-check overhauls, 4 × 1010 kVA
  • JLL India — Registered Service Provider (sites incl. H&M Surat, HSBC, J&J)
  • Cars24
  • Hardcastle Restaurants (McDonald’s India)

As a Registered Service Provider to JLL India, we already operate inside FM governance — PO-linked compliance, HSSE prequalification (Aravo), and per-site reporting that rolls up to portfolio reviews.

IT / QSR / Facilities, answered

Frequently asked questions

Do you work under facility-management companies?

Yes — Power Solutions is a Registered Service Provider to JLL India, serving JLL-managed sites Pan-India including H&M, HSBC and J&J facilities, with the PO-linked compliance and HSSE prequalification that FM governance requires.

Can you overhaul campus DG farms without exposing the load?

Yes — staged overhauls with sets taken out one at a time and redundancy verified before each stage, as done for the D-check top overhauls on four 1010 kVA Cummins sets at IBM Bangalore.

Can one AMC cover mixed genset brands across our portfolio?

Yes — multi-brand is the core of our AMC practice: Cummins, Kirloskar, Perkins, MTU and others under one contract, one SLA and one consolidated report.

Reply within 4 working hours. Engineered offer within 24 hours.