Industries · Food, Beverage & Bottling
Power synchronised to the production line
Two 1500 kVA turnkey installations at Coca-Cola bottling plants — one synchronised with the plant’s existing 1250 and 500 kVA sets. Production lines don’t forgive power that arrives out of step.
Where it hurts
Line stoppage is product loss
A filler line that stops mid-run means waste, cleaning cycles and lost shift output — not just downtime.
Growing plants, existing sets
Capacity grows in steps; the new set must synchronise with what is already installed, whatever its brand.
Hygiene-zone constraints
Exhaust routing, fuel storage and noise all have to respect food-safety zones and audits.
Typical configurations
| Facility type | Typical rating | Notes |
|---|---|---|
| QSR outlet / dark kitchen | 25–82.5 kVA | Kitchen line, refrigeration, HVAC |
| Food factory | 250–1010 kVA | Process + refrigeration, sync with existing sets |
| Bottling plant | 1010–1500+ kVA | Turnkey with sync panels and 30 m stacks |
Served in this sector
Names, not adjectives.
- Udaipur Beverages (Coca-Cola bottling), Jabalpur
- Narmada Drinks (Coca-Cola bottling), Bilaspur
- Weikfield Foods — 1010 kVA synchronised with existing CAT sets
- Hardcastle Restaurants (McDonald’s India) — AMC, Maharashtra
Cross-brand synchronisation is the signature capability here: a new 1010 kVA Cummins synchronised with existing CAT sets at Weikfield, and a 1500 kVA set synchronised with existing 1250 + 500 kVA units at a Coca-Cola bottler.
F&B / Bottling, answered
Frequently asked questions
Can a new genset synchronise with our existing sets of a different brand?
Yes — synchronising panels with Woodward or equivalent controllers handle cross-brand paralleling. We synchronised a new 1010 kVA Cummins with existing CAT sets at Weikfield Foods, and a 1500 kVA unit with existing 1250 and 500 kVA sets at a Coca-Cola bottling plant.
Do you serve QSR chains under AMC?
Yes — Hardcastle Restaurants (McDonald’s India) is an AMC client for DG sets across Maharashtra, on the multi-site, per-outlet schedule structure that chains need.
Can you handle the full installation at a running plant?
Yes — turnkey scope including exhaust structures to 30 metres, fuel systems and commissioning, sequenced around production schedules, as delivered at bottling plants in Jabalpur and Bilaspur.
Reply within 4 working hours. Engineered offer within 24 hours.